Maybe I am a little old-fashioned but the appearance of the “Site Safety” signs on the fence and back door, declaring the patio a building site was the big indicator the work was underway.

 

In no time at all big changes started to appear. The Grapes St., wall was down, the patio garden removed, tree cut down and the slates and roof came off the toilet as did most of the internals.

 

Then the toilet walls, things are moving forward at a pace.