Building - Week Three  (14th Nov)

 

Toilets, what toilets? Week three saw the “standalone” walls of the toilet block, the fittings and floor being removed before the arrival of Cheshire Demolitions to clear away the debris and to remove the retaining wall and to excavate further back towards Grapes St.

wpbf625c81_0f.jpg
wpa340118f_0f.jpg
wp207b4060_0f.jpg

The area has now been cleared back to the required size, and dug further down to be ready to lay new drainage pipes and then to receive the concrete foundations for the new build.